Shaping Your Outdoors. Surpassing Expectations.
Installation of code-compliant backflow prevention devices to protect your water supply and meet requirements.
The best window for backflow installation in Lake Stevens is late summer into early fall. July averages about 0.74 in of rain (Daymet, 2005-2025), so trenches stay workable and the irrigation system is running, which makes it easy to test the new assembly under real use. The median first fall frost is Nov 10, so there is time to finish before cold weather.
A backflow assembly keeps irrigation water from flowing back into your drinking water supply. If your sprinkler system lacks one, or has an old unit, planning ahead in the dry months keeps the job off the winter calendar.
The median date of the first fall frost (32 F) in Lake Stevens is Nov 10, per Daymet data from 2005-2025. That is a median, so frost can arrive earlier or later in a given year. An assembly installed above ground needs to be in place and ready to be winterized before that first hard freeze. Per the same data, Lake Stevens sees about 41 nights a winter that drop below freezing between October and April. Exposed pipe and a backflow assembly can be damaged by those nights, so insulation, a protective cover or a careful shutdown routine matters.
Scope depends on a few things you can check before we visit. Where does the water line enter the property? How far is the planned assembly location from the irrigation connection? Is there an existing assembly that needs replacing, or is this a new install? Trenching through lawn, beds or hardscape adds work. The type of assembly and its height above grade also matter, and local water utility rules may set requirements. Your own yard and utility may differ from what is typical, so we look at the actual site.
We start with a free estimate. Washington Landscaping has been in business since 2004 and is licensed, bonded and insured ($2M). After installation, the assembly must be tested. We have a certified backflow assembly tester, so testing can be tied into the same project rather than arranged separately. Financing is available subject to credit approval if you want to spread out the cost.
Practical tip: before we visit, find your irrigation shutoff and take a photo of the area where you would want the assembly. Note any sprinkler heads, utility boxes or plantings nearby. It speeds up planning and helps avoid surprises. To reach us, call or text 425-433-9444.
| Dry months (under 1.25 in) | July |
|---|---|
| Average yearly precipitation | 50.8 in |
| Last / first frost (median) | Mar 24 / Nov 10 |
| Days that freeze at night and thaw by day | 40 a year |
| Frost-free season | about 225 days |
Dates are medians for the city from Daymet 2005-2025; your yard and any given year can differ.
Share of rated land in the USDA SSURGO soil survey; built-over ground is not rated. A soil check on your lot tells you what you have.
Sources: Daymet daily weather (NASA/ORNL), 2023 USDA Plant Hardiness Zone Map data (PRISM, Oregon State University), USDA SSURGO soil survey, USGS 3DEP elevation, USFS/NLCD tree canopy 2025, US Census ACS 2020-2024.
A city surrounding the lake of the same name in central Snohomish County.
Protects your potable water supply; Correct device type for your system; Installed to local code; Placed for freeze protection and testing; Keeps you compliant
Tell us about your project. We’ll review your needs and provide a customized, no-obligation proposal.
Complete the form or call our team to discuss your project.
We’ll review your property, discuss your goals, and recommend an appropriate solution.
Receive a detailed estimate outlining the proposed work and pricing.