Shaping Your Outdoors. Surpassing Expectations.
Protective sealing that guards pavers against stains, weeds, and weather while enriching their color.
Lake Stevens gets measurable rain on about 136 days a year, per Daymet data for 2005-2025. That leaves limited time for sealer to cure, so timing is the biggest decision in paver sealing here.
Washington Landscaping seals patios, driveways and walkways made of concrete or stone pavers. The work is cleaning, repairing joints, sealing and letting it cure. Estimates are free, and you can call or text 425-433-9444 to ask about your pavers.
Sealer needs clean, dry pavers and dry weather after it goes on. With rain on about 136 days a year in Lake Stevens (Daymet, 2005-2025), the schedule matters as much as the product.
July is the one month that averages under 1.25 in of rain, at about 0.74 in (Daymet, 2005-2025). Dry stretches in summer are the most dependable window for cleaning, drying and curing. Those are averages, though. Any given week can still turn wet, so a job may shift a few days to wait for a clear forecast.
Tree canopy covers about 31.4% of Lake Stevens (USFS/NLCD 2025). That figure describes the city as a whole, and your yard may have more or less shade. Where pavers sit under trees, they tend to stay damp longer. Needles, leaves and debris hold moisture and feed moss and algae. Shaded pavers may need a longer drying time before sealing. Expect to sweep or rinse them from time to time afterward.
Sealing can deepen the color of the stone and help resist stains and joint sand loss. It does not make pavers immune to moss or wear. If the base has settled or pavers have shifted, those problems are better fixed before sealing.
Washington Landscaping has been in business since 2004 and is licensed, bonded and insured. Hardscaping work carries a 1-year workmanship warranty. Financing is available subject to credit approval.
| Days that freeze at night and thaw by day | 40 a year |
|---|---|
| Land sloping 15% or more | 12% (40% or more: 0.6%) |
| Days with 0.1 in or more of rain | 136 a year |
| Soil drainage (rated land) | 4% well, 88% moderately well, 8% poorly drained |
| Elevation range | 105 to 441 ft |
Dates are medians for the city from Daymet 2005-2025; your yard and any given year can differ.
Share of rated land in the USDA SSURGO soil survey; built-over ground is not rated. A soil check on your lot tells you what you have.
Sources: Daymet daily weather (NASA/ORNL), 2023 USDA Plant Hardiness Zone Map data (PRISM, Oregon State University), USDA SSURGO soil survey, USGS 3DEP elevation, USFS/NLCD tree canopy 2025, US Census ACS 2020-2024.
A city surrounding the lake of the same name in central Snohomish County.
Guards against oil and stains; Locks joint sand to resist weeds; Sheds moisture and resists moss; Enriches paver color; Extends the life of your hardscape
Tell us about your project. We’ll review your needs and provide a customized, no-obligation proposal.
Complete the form or call our team to discuss your project.
We’ll review your property, discuss your goals, and recommend an appropriate solution.
Receive a detailed estimate outlining the proposed work and pricing.