Shaping Your Outdoors. Surpassing Expectations.
Protective sealing that guards pavers against stains, weeds, and weather while enriching their color.
For paver sealing in Tacoma, July and August are the natural window. Those are the city's dry months, with July averaging about 0.53 in of rain and August about 0.9 in (Daymet, 2005-2025). Pavers need to be clean and fully dry before sealer goes on, and a dry stretch gives that time.
Washington Landscaping can look at your patio, walkway or driveway, explain what sealing would involve, and give a free estimate. Planning ahead matters, because the rest of the year is wetter and dry days are harder to count on.
Sealing is mostly about preparation. The pavers are cleaned first, and any moss, algae, or old stains are dealt with. Joint sand is checked and topped up where it has washed out. Then the surface has to dry completely before sealer is applied.
That is why timing matters here. Tacoma gets about 118 days a year with 0.1 in or more of rain (Daymet, 2005-2025). Rain on fresh sealer can cloud the finish or keep it from curing properly. Pavers also hold moisture longer in shade, so a damp corner can delay work even on a dry week.
Several things affect the scope of the job:
Tree cover is one. Per USFS/NLCD 2025 data, canopy covers about 15.9% of Tacoma. That figure describes the city as a whole, and your yard may have far more or far less shade. If your pavers sit under trees, expect more moss, leaf stains, and needles in the joints, which means more cleaning before sealing.
Surface condition is another. Pavers that have shifted, settled, or lost a lot of joint sand may need repair first. Sealing will not fix an uneven surface. Size and use also matter. A driveway that takes vehicle weight and oil drips has different needs than a quiet back patio.
On the day, expect the area to be off limits while the sealer cures. Plan to keep foot traffic, pets, and furniture off until you are told it is ready, and keep cars off longer. Washington Landscaping has been in business since 2004, is licensed, bonded and insured, and hardscaping work carries a 1-year workmanship warranty. Financing is available subject to credit approval.
One practical tip: before you book, walk the area after a stretch of dry days and note which spots stay damp or green. Show those to the estimator. They tell us where extra cleaning and drying time will be needed.
| Days that freeze at night and thaw by day | 31 a year |
|---|---|
| Land sloping 15% or more | 11% (40% or more: 2.9%) |
| Days with 0.1 in or more of rain | 118 a year |
| Soil drainage (rated land) | 17% well, 75% moderately well, 7% poorly drained |
| Elevation range | -5 to 445 ft |
Dates are medians for the city from Daymet 2005-2025; your yard and any given year can differ.
Share of rated land in the USDA SSURGO soil survey; built-over ground is not rated. A soil check on your lot tells you what you have.
Sources: Daymet daily weather (NASA/ORNL), 2023 USDA Plant Hardiness Zone Map data (PRISM, Oregon State University), USDA SSURGO soil survey, USGS 3DEP elevation, USFS/NLCD tree canopy 2025, US Census ACS 2020-2024.
The Pierce County seat and a major port city on Commencement Bay of Puget Sound.
Guards against oil and stains; Locks joint sand to resist weeds; Sheds moisture and resists moss; Enriches paver color; Extends the life of your hardscape
Tell us about your project. We’ll review your needs and provide a customized, no-obligation proposal.
Complete the form or call our team to discuss your project.
We’ll review your property, discuss your goals, and recommend an appropriate solution.
Receive a detailed estimate outlining the proposed work and pricing.